Google
 
Showing posts with label CHANAKYA PURI NEW-DELHI-110021.. Show all posts
Showing posts with label CHANAKYA PURI NEW-DELHI-110021.. Show all posts

Saturday, July 28, 2012

CENTRAL BOARD OF IRRIGATION AND POWER MALCHA MARG, CHANAKYA PURI NEW-DELHI-110021


POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING

52 Weeks POST GRADUATE DIPLOMA  COURSE  IN THERMAL POWER PLANT ENGINEERING (2nd Batch) Admission Notice 2012


For more details visit here:

The Indian power Sector is presently passing through a phase of transition of technology up-gradation in the area of Generation and Transmission of Power.  Several new Ultra Mega Thermal Power Projects are in the process of installation both in Public and private sectors  where advanced technology like  Super  Critical  Technology supported by the latest technology of Electrical, Control & Instrumentation systems etc are coming in a big way. The course contents of this one year training programme have been designed to fulfill the mandatory requirements of Indian Electricity Rules amended in 1981 to groom the students having the basic theoretical knowledge of Power Generation from their college with the latest technology of Operation & Maintenance of the Thermal power plants. After completion of the course, the Engineers would be eligible for operation & Maintenance of Power plants of Capacity 100 MW and above as the course is in line with the syllabus recognized by Central Electricity Authority (CEA).
The duration of the course would be 52 weeks having 2 semesters  comprising  class room sessions as well as on-the-job training. The students have to attend the on-job practice sessions in power plants, substations etc. Visit to some reputed manufacturing plants is also an integral part of the course. At the end of the course, 2 weeks Simulator training will be arranged in the Simulator having latest state of the art technology. To enhance the personal skills, some inputs  of management are also to be given to the students.



WHY YOU SHOULD JOIN CBIP FOR THIS COURSE?
India is growing at faster pace with a GDP of around 9% for the last 5 years.  To sustain this GDP it is necessary to have the growth of its power sector even at a higher rate. 
Indian Power industry, being highly capital intensive industry, is growing at a very fast rate of about 10% per annum. The present installed capacity of Indian power industry is about 202979.03 MW. To keep pace with the GDP growth of our country Govt. of India has a mandate of adding about 75,000MW to 100,000MW during the 12th (2012-2017) Five Year Plan and about same capacity during 13th Plan (2017-2022).Human resource development and capacity building in the present power scenario demands a very comprehensive and pragmatic approach to attract, utilize, develop, and conserve valuable human resources. Training, re-training, and career prospects are some of the important elements of  human resource development. By the working group on manpower planning in power sector it has been estimated that there is a shortage of skilled manpower which is fast emerging as a serious obstacle to the Govt. efforts to expedite the pace of power generation capacity addition in the country. Technically trained manpower comprising skilled engineers, supervisors, artisans/technicians and managers is required in every sphere of the power supply industry. The capacity addition along with commensurate Transmission and Distribution infrastructure leads to an estimated requirement of about 7.4 Lakh additional personnel for construction and O&M during 12th plan itself.
In order to mitigate the shortage of trained manpower Govt. of India has already taken many initiatives for providing training and developing the required manpower but the requirement of trained manpower is so high that there is a need of training/retraining of fresh and in service engineers and groom them by providing them the required training inputs and make them readily available for deploying them in the Power Sector as per its manpower requirements.
Hence, there is an ample scope of making a carrier in the Power Sector for the Engineers who undertake this programme.
In view of this CBIP has  taken initiative and launched  52 weeks Post Graduate Diploma Course in Thermal Power Plant Engineering as training in Power Sector is niche area of CBIP:
 The objective of the course is to develop groomed manpower for the power ·sector having high skills and confidence in running a Power Plant. After completion of the course the students would be readily available for the Indian Power Sector for taking over the charge of Operation & Maintenance of Power Plant equipments.
 The course satisfies the mandatory requirements of Rule 3 of Indian Electricity ·(Amendment) Rules, 1981 and Indian Electricity Act, 2003.
The course is also open for the sponsored candidates from SEBs and Power Utilities (Public & Private).
The present course is for 2nd batch for PGDC in Thermal Power Plant Engineering.


The course will be conducted under the supervision of experienced faculty who were the main initiators of this program in Indian Power Sector. Sh. C.S. Malik, Director, CBIP formerly Principal Director, NPTI and Sh. S.K. Ghosh, Adviser, CBIP, formerly Director, NPTI would be supervising this course.

COURSE CERTIFICATION
Certificate will be issued by  Central Board of irrigation & Power (CBIP) which is a reputed autonomous body in the field of Power & Water Resources having liaison with various Govt./Semi-Govt./Pioneer-Pvt. Sector Organizations including Central Electricity Authority, NTPC, NHPC, Powergrid etc.


PLACEMENT SERVICES
CBIP maintains close linkages with various power utilities and reputed companies of Indian Power Sector. Most of the Govt. utilities, IPPS, T&D utilities etc and other reputed manufacturing organizations of the above said field are associated with CBIP as member organizations and prefer to depute their Engineers to attend the training programmes/Workshops/ Seminars at CBIP. Though there is no commitment for placement of the candidates, CBIP would try its best and exploit all the opportunities for arranging campus interviews through its good networking with all of the power sector utilities/companies including reputed manufacturers. Almost all the candidates of 1st Batch of PGDC in Transmission & Distribution System have been placed in reputed organizations like WAPCOS, Powerlinks Transmission Ltd., Skipper Electricals India Ltd., Noida Power Co. Ltd. (NPCL), Indiabulls Ltd., Epsilon Asia, etc. Also the placement activities for the 1st Batch of PGDC in Thermal Power Plant Engineering have already been started and a good response from different organizations/independent power producers have already been recieved.


INFORMATION TO THE CANDIDATES
A) WHO CAN APPLY
 The candidates who have obtained B.E./B.Sc. (Engg.), A.M.I.E. or  equivalent ·degree in Mechanical/Electrical Engineering are eligible to apply for admission to this Post Graduate diploma Course. Those appearing in their final year examination may also apply. However, they must submit their degree/provisional degree at the time of counseling/start of the course.
 Graduate Engineers sponsored by State Electricity Boards/Power Utilities and ·Private Companies  with at least one year post qualification experience as on 01/10/2012 and minimum 60% marks in BE/B-Tech./equivalent degree.
B) COURSE FEES/PAYMENT OF FEE 
For non-sponsored candidates: Rs.1,50,000/- (to be  paid in 3 installments; 1st installment – Rs.60,000/- at the time of counseling (non-refundable), 2nd Installment –Rs.50,000/- latest by 07/01/2013, 3rd Installment – 40,000/- latest by 08/04/2013)
For sponsored candidates: Rs. 2,00,000/- (to be paid in full at the time of counseling)
Course fee includes the Simulator Training fee.

Travelling/lodging cost in case of outstation visits is to be borne by the students.

For foreign nationals: US$6,000/- (to be paid in full at the time of counseling)
The course fee may be paid in the form of demand draft drawn in favour of “CBIP, New Delhi”. The payment may also be done through online system of banks (ECS/RTGS/NEFT). The details of the bank of CBIP where remittance is to made through online banking is given below:
i. Name of the Bank: ICICI Bank Ltd.
ii. Brand Address: 16/48, Malcha Marg, Shopping Center, Chanakyapuri, New Delhi-110021.
iii. Branch Code: ICIC0000346
iv. MICR: 110229052
v. S/B A/c Number: 034601000738
In this case the candidates may supply the following information to CBIP through email/fax/letter:
i. Name of the student
ii. Amount Paid
iii. Name of the Bank/Branch
iv. Transaction ID/ UTR (Unique Transaction Reference) Number 
C) SELECTION CRITERIA FOR ADMISSION
Admission will be given on the following basis:
I. 70% seats to be filled up based on the score card of GATE and PGDC CET-2012 with minimum 60% marks in various examinations from 10th onwards.
II. 30% seats from general applications based on the marks of 10th, 12th and Engineering Degree with minimum 60% marks in various examinations from 10th onwards.
Admission shall be subject to verification of documents. A candidate who is allotted a seat during counseling will be required to pay the 1st installment of fee (Rs.60,000/- for non sponsored candidate and Rs.  2,00,000/- for sponsored candidate) immediately without which the admission will not be confirmed.
D) TOTAL SEATS
Total No. of seats for the program is 60 (may vary). 10% of the seats are reserved for candidates sponsored from Power utilities having more than one year experience and more than 60% marks in Engineering Degree.
The seats of sponsored category can be filled by non-sponsored category and viceversa depending on the position of vacant seats.
E) AGE LIMIT
For the non sponsored candidates maximum age limit as on  07/07/2012 is 27 years. 
However, there is no age limit for the sponsored candidates.
F) COUNSELING
Counseling will be held at CBIP, Malcha Marg, Chanakyapuri, New Delhi, opposite to Carmel Convent, Malcha Marg between 10AM to 5-30PM. The candidates must appear in person  on the date of counseling  with all relevant original documents like Birth certificate, Educational qualifications, GATE/PGDC CET-2012 Score Card, CGPA/CPI conversion chart issued by the registrar/controller of examinations of the concerned 
university (in case of CGPA/CPI candidates).
G) SPONSORED CANDIDATES
The Candidates who are sponsored from any organization have to enclose a sponsorship  certificate issued by their respective organizations in the format given on the CBIP website.



HOW TO APPLY
Application as per the format available on CBIP website on plain paper along-with the demand draft of Rs.700/- in favour of “CBIP” payable at New Delhi, should reach the Secretary, CBIP, (address given below) latest by  01/09/2012 with Two passport size photographs. Candidates are advised to go through the brochure thoroughly before filling the form.

Points to be Noted:
i. All the future notifications/ information will be available on CBIP website. The candidates are advised to be regularly in touch with the website.
ii. Attach attested copies of proof of  date of birth,  certificates/scorecard of 10th/12th/Engg. Graduation/GATE Score Card/PGDC CET-2012 Score Card/ CGPA/CPI Conversion Chart issued by Registrar/controller of the concerned university.
iii. Application fee is non refundable.
iv. Applications after due date will not be accepted.


ADDRESS FOR COMMUNICATION
Secretary, CBIP, Malch Marg, Chanakyapuri, New Delhi-110021
Tel No: 011-26875017/26116567/24102437/ Fax: 011-26116347


IMPORTANT DATES
Last Date for receipt of completed application forms: 01/09/2012
Announcement of 1st list of candidates for counseling on website: 07/09/2012
Dates for first counseling: To be intimated 
Dates for second counseling (in case of any vacant seat): To be intimated 
Commencement of Course: 01/10/2012

 


IMPORTANT DATES
Last Date for receipt of completed application forms: 01/09/2012
Announcement of 1st list of candidates for counseling on website: 07/09/2012
Dates for first counseling: To be intimated 
Dates for second counseling (in case of any vacant seat): To be intimated 
Commencement of Course: 01/10/2012